777-2/E/2 Anglais

Structures built over railway lines - Construction requirements in the track zone

Ed. no.2 | September 2002

Langages disponibles

Allemand Anglais Français
Prix 318,61 € TTC

302,00 € HT

Summary

This leaflet sets out recommendations for managing the risk from derailed trains near structures built over railway lines. It distinguishes between structures that are generally occupied (for example, multi-storey office blocks) and those that may not be occupied (for example, bridges). Different methods are proposed for these two types of structure. The methods take into account those people most at risk and the likely speed range for rail traffic passing under these structures. It is made clear that, in assessing the risk, some parameters are the responsibility of the railway and not the engineer.

777-2/E/2-PDF

Fiche technique

Langage
Anglais
Edition
Ed. no.2
Date d'édition
01/09/2002
Date de publication
01/09/2002
Nombre de pages
46
Thème
Infrastructure Infrastructure
sku
777-2/E/2
Reference
777-2